HAIT Journal of Science and Engineering B Volume x, Issue x, pp. xxx-xxx © 2004 Holon Institute of Technology | |||||
| |||||
Performance of adaptive frequency scheduling in a group of radio communication links
Roman E. Goot
Department of Computer Science and
Center for Industrial and Applied Mathematics, | Holon Institute of Technology, 52 Golomb Str., Holon 58102, Israel e-mail: goot@hait.ac.il Received 9 June 2004, accepted 3 September 2004
| The article treats the algorithm, potential and real efficiency of adaptive frequency scheduling procedure on instant data in group of radiolinks. The algorithmization problem is reduced to a well-known transport problem of linear programming. The figure-of-merit of performance is introduced and its potential bounds are determined. The methodology of how to take into consideration the influence of real factors on deterioration of efficiency is proposed. An example with delay of communications is presented.
|